Welcome to Zhangjiagang Alite Machinery Co.,Ltd!

ALT-ZD2000 nonwoven (medical) bed sheet folding machine

 

 




TOUCH SCREEN

 

 

 

Equipment Introduction

1.1 Equipment requirements: The device can process all kinds of spunlace non-wovenhot air fabric, hot-rolled fabric; acupuncture cloth, spunbond fabric, SMS, paper-plastic and other raw material.

1.2 Equipment working principle: Longitudinal foldingcutting length automaticallyTransverse foldingoutput automaticallyProduct stacking, the whole line complete automatically.

1.3 Width of raw material under 2000mm

1.4 Folded width longitudinally arbitrary adjustable, the product Cutting length can be adjusted between 500-3000mm, length error of ± 5 mm.

1.5 Transverse folding: one half ,one- third, one -quarter, one sixth, one-eighth

1.6 The machine adopts the cylinder to promote the material and tension control automatically, without manual operation

1.7 All the drives use the imported servo motor, high precision

1.8 Touch screen control, only need to enter the data can change the specs, easy to operate.

1.9 Electronic-control is touch screen man-machine interface operationcounting.

1.10 Entire delivery system, strong, durable, non-polluting;

1.11 Electrical wiring specifications and reasonable, elegant, easy to operate.

 

 

 

Technical parameters:

2.1 Supply Voltage: 380V 50HZ

2.2 Power: 8KW

2.3.Weight: 4000kg

2.4.Speed: 0-60 m / min

2.5.Dimensions: 10300 * 2400 * 2300mm

2.6.machine color: silvery white

Equipment configuration list:

3.1  Servo drive: Delta (Taiwan) 5sets

3.2  Gear motors: Yongkun (Taiwan) 1set

3.3  Motion Controller: Delta (Taiwan) 1 set

3.4 Touch screen: Delta (Taiwan)   1set

3.5  Low-voltage electrical: delixi

3.6  Air shaft: 1set

3.7  Cylinder:  1set

Machine structure Description

The host by the channel steel welded together, solid and firm, surface painting, The feeding part is aluminum alloy rack, the appearance is beautiful and will not get rusted permanently.

Electronic control system

5.1 PLC control system, touch screen man-machine interface operation, easy to operate, humanized design

5.2 Through the man-machine interface to adjust speed, the size of the finished product ,and Stacking quantity.

5.3With Chinese and English operator interface, easy to operate

 

Installation and terms of Service

6.1  we provide door to door service for domestic customers, foreign customers need to install the machine by themselves. Our engineer at the request of foreign customers can door-to-door service, but users are responsible for accommodation, round tickets visa fees and so on (domestic except). And pay our engineer 100USD one day 

6.2  The seller is responsible for equipment packaging costs, use FOB export situation

6.3 Random with common wearing parts and special tools

6.4 After leaving Shanghai port the buyer is responsible for the freight, insurance premiums and unloading

Warranty scope and manner

7.1.1 Since user as the date of buy is responsible for one year warranty.

7.1.2 warranty item: machine transmission and electronic control system

Warranty manner

7.2.1 If some parts damaged, users can disassemble send manufacturer or repair the exchange.

7.2.2Our engineer at the request of customer can door-to-door service, but users are responsible for accommodation, round tickets visa fees and so on (domestic except).

In the following circumstances, our factory is not responsible for warranty, execute collect fees repair:

7.3.1. Artificial damage, such as the machine damage cause by foreign body in fall.

7.3.2. Users without manufacturers agreed to repair itself or has been disassembled.

7.3.3. Users without changing accessories etc.

7.3.4. Customer production voltage instability caused electric damage.

7.3.5. The user handling of corruption. 

Considerations

8.1 The machine main components should be checked regularly, Such as welding and  cutting  bearing working case, filling oil appropriately to ensure that it is working properly.

8.2 Periodically check the wear of the welding, Appropriate adjust the pressure, In the case of guarantee welding well, make the pressure minimum.

8.3 Each unwinding trays tension should be checked in order to adapt to the production needs.

8.4the cutter pressure should be appropriated, otherwise easily lead to a situation such as knife fight 

free parts

9.1 wrench : 1 piece

9.2 cutter : 2 pieces

Quotes and payment

10.1payment: After 50% of the total value is paid in advance by (T/T),

The left 50% should be paid by (T/T) after you check up the finished

machine. And the cargo will be delivered after all the payment

arrives at our account.

10.2 The quote is valid: 30 days

10.3 Delivery Date: Within 15 working days after receipt of prepayment from customers

Folded widthunder 30cm

material width under2000mm

 


Previous:Nothing
Copyright ? 2023 Zhangjiagang Alite Machinery Co., Ltd  蘇ICP備14011781號  
主站蜘蛛池模板: 一级特色黄大片| 一区免费视频| 精品久久久久久久| 亚洲视频一区在线播放| 国产精品一区二区久久精品| 国产欧美一区二区另类精品| 黄工厂精品视频在线观看| 亚洲欧洲日本在线| 国产精品久久久久久久免费大片| 黄色一级毛片| 国产成人啪精品视频免费网| 国内自拍小视频| 4438x17全国最大色成网站| 广东毛片| 九九热8| 99ri9| 国产自产拍精品视频免费看| 在线a视频| 国产精品特黄毛片| 成年女人视频播放免费观看 | 好爽毛片一区二区三区四| 4hu影院最新地址www| 精品视频一区二区三区四区| www.亚洲第一| 黄页网站在线| 大伊香蕉在线精品视频人碰人 | 成人免费网站在线观看| 亚洲精品社区| 国产36d在线观看| 99久热| 精品在线视频免费观看| 国产一卡二卡3卡4卡更新| 91视频网页| 韩国福利一区二区三区高清视频 | 国产日韩91| 99久久国产免费福利| 4hu影院在线观看| 伊人天伊人天天网综合视频| 亚洲男人天堂岛| 精品在线观看视频| 99久久精品久久久久久清纯|